top of page

Our Projects... Pg 2

Portlight Visors

Seaworthy PortVisors TM were added on all three portlights to allow ventilation while raining.

Fwd Rail Mod

A removable rail section was added on the stbd side fwd of the helm door to provide fwd access to / from docks and to allow easier access to high walls that are common along the NY canal system.

Note: the Portlight pic above was prior to the gate add

Holding Tank Aeration

​Aeration of the holding tank was added as a way to reduce holding tank odors.

bottom of page